Our Projects
Supply of Automated Zinganization (Galvanization)
- Client: Public Electrical Works Company (PEWCO)
- Project Description: In this project, Zinc Co. Ltd. supplied an automated coating plant that can carry out the process of cleaning, surface preparation & automatic painting and drying for the steel parts of high power line steel towers.
- Raw Materials: The main raw materials for this plant is ZINGA product.
- Plant Capacity: About 1.5 million pieces of steel per year.
- Quantity Supplied: About 14 tons of ZINGA for start-up & commissioning.
- Project Status: completed.
First
Project



Second
Project



Supply of ZINGA coating for the steel structures of water steel tanks
- Location of Project: Ghot Sultan Complex for Cattle & Poultry – Al-Biar City
- Client: Arabian Gulf Oil Company (AGOCO – Benghazi)
- Project Description: In this project, Zinc Co. Ltd. supplied ZINGA to be used as a 60-micron primer coating for the steel structures of 11 water steel tanks, each with a 100 cubic meter capacity.
- Raw Materials: The main raw materials for this project is ZINGA product.
- Steel Surface Area: About 2,000 m²
- Quantity Supplied: About 3 tons
- Project Status: completed.
Supply of ZINGA coating for the steel structures of Benina Airport - (Terminal 1 project)
- Location of Project: Benina Airport - Benghazi
- Client: Daelim Industrial (Korean Company)
- Project Description: In this project, Zinc Co. Ltd. supplied ZINGA to be used as a 60-micron primer coating for the steel structures of the project.
- Raw Materials: The main raw materials for this project is ZINGA product.
- Steel Surface Area: About 25,000 m²
- Quantity Supplied: About 12 tons
- Project Status: completed.
Third
Project



Fourth
Project



Supply of a second automatic Zinga station for the iron tower parts of high-power transmission lines.
- Client: Public Electrical Works Company (PEWCO)
- Project Description: In this project, Zinc Limited will supply an automatic Zinga station capable of performing cleaning, surface preparation, automatic painting, and drying operations for various sized steel parts used in power line steel tower construction.
- Raw Material: The basic material of this project is ZINGA product.
- Station capacity: under negotiation
- Project Status: completed.